pl

TARNOWO CENTRE ESTATE - Tarnowo Podgórne

 

 

 

 

 

 


 

 

RECOMMENDED BY RESIDENTS

 

Within the framework of the Tarnowo Centrum housing estate is planned to build 31 multi-family buildings. In five investment stages, two B-type houses and four A-type buildings are built and occupied, one of them with utility buildings on the ground floor. We leave the B type buildings. Our housing is characterized by modernity and cosiness. Functional layout of the rooms with good interior design, with the comfort of use.

Airport

Poznań Ławica

14 km

20 miniut

ING Bank Śląski

ul. Poznanska 84

300 m

1 minuta

Railway Station

Poznan Central

20 km

28 minut

WBK Bank Zachodni

ul. Poznanska 74

400 m

1 minuta

Bus Station

PKS Poznan

21 km

29 minut

PKO BP

ul. Poznanska 80

300 m

1 minuta

PEKAO SA

ul. Poznanska 80

300 m

1 minuta

Post Office

ul. Poznańska 105

350 m

1 minuta

Chata Polska

ul. Szkolna 5

200 m

1 minuta

High Scchool and Secondary School

ul. Poznańska 118

700 m

1,5 minuty

Lidl

ul. Poznańska 48

900 m

2 minuty

Primary School

ul. Szkolna 5

200 m

1 minuta

Auchan

Swadzim, św. Antoniego 2

8 km

11 minut

Kindergarten

ul. Ogrodowa 2

900 m

2 minuty

Leroy Merlin

Swadzim, św. Antoniego 6

7 km

10 minut

 

STANDARD OF FINISH OF FLATS

1. Primer for floors
Cementitious screeds erased mechanically stacked Styrofoam insulation. The level of cementitious screeds in all areas at the same height. Primers prepared for panels or tiles


2. Supporting walls
25 cm thick hollow bricks


3. The interior plaster walls and ceilings
Single-layer, plaster done mechanically, prepared for filling and painting

 

4. Ceilings
Reinforced concrete filigree

 

5. Windows
PVC innovative hardware, gaping, Tilt-turn (as documented construction), with veneer exterior in gray, double glazed, with a coefficient K = 1.1 W / m2K. In attics skylights opened manually, the window on the ground floor equipped with a manually operated roller shutters, the windows of depression (recess) for mounting the window sill with a thickness of 3cm; standard does not cover the delivery and assembly of internal window sills

 

6. Entrance doors to apartments
Burglar, single, full, with the number of housing and visor

 

7. Partitions
With silicate blocks / aerated concrete, plastered on both sides

 

8. Balconies
Isolated przeciwwilgociowo, balustrades in the form of steel-and-glass elements, according to the draft

 

9. Electrical Installation
3-phase approach to the kitchen electrical socket 20-30cm above the floor, switches 1,4m above the floor, the installation of the electric bell; switches and sockets in white color, lighting points ended dice, distribution and amount according to the project

 

10. Installation of water and sewage
Installation of hot and cold water run in floors, shafts or grooves; water meter for each premises; sewage system with PVC pipes run in floors, shafts or grooves; does not include white assembly

 

11. The gas pipe
Does not occur in premises

 

12. Install C.O.
Pipelines C.O. carried out in the roof floor layers, with the lower connection of radiators; steel radiators, and panel and with valves termoregulacyjnymi; heat consumption meter

 

13. Install TV, telephone and online
To bring the installation into each dwelling for TV, TEL, INTERNET; location of outlets according to the project

 

14. Intercom installation
One dwelling intercom connection with the entrance to the stairwell

STANDARD OF FINISH PREMISES

1. Primer for floors
Cementitious screeds erased mechanically stacked Styrofoam insulation. The level of cementitious screeds in all areas at the same height. Primers prepared for panels or tiles

 

2. Supporting walls
25 cm thick hollow bricks

 

3. The interior plaster walls and ceilings
Single-layer, plaster done mechanically, prepared for filling and painting. Standard does not cover the plaster on the ceiling.

4. Ceilings
Reinforced concrete filigree

 

5. Windows
PVC (according to construction documentation) with a veneer exterior in gray, inside white, double glazed, with a coefficient K = 1.1 W / m2K. Under the windows of a depression (recess) for mounting the window sill with a thickness of 3cm. Standard does not cover the delivery and assembly of internal window sills

 

6. Doors:
- Internal (if provided project) - steel gray, single, complete with the number of premises
- External single or double (according to the project) - frame, glazed, with a self-closing, from the outside in gray

7. Partitions
With silicate blocks / aerated concrete, plastered on both sides


8. Electrical Installation
Sockets 20-30cm above the floor, switches ok.1,4m above the floor. Switches and sockets in white color, lighting points ended dice. The distribution and quantity according to the draft prepared for the installation of installation of air curtain over the entrance door.

 

9. Installation of water and sewerage
Installation of hot and cold water run in floors, shafts or grooves; water meter for each premises; sewage system with PVC pipes run in floors, shafts or grooves; does not include white assembly

 

10. Installation of Gas
Does not occur in premises

 

11. Install C.O.
Pipelines C.O. carried out in the floor of the floor layers, the bottom connection of radiators; steel radiators, and panel and with valves termoregulacyjnymi; heat consumption meter

 

12. Install TV, telephone and online
To bring the installation into each dwelling for TV, TEL, INTERNET; location of outlets according to the project

 

13. Other
For each apartment provides an additional channel for customer to install air conditioning

STANDARD OF FINISH OF BUILDINGS AND PARTS OF COMMON (INSIDE)

1. Internal plasters
Gypsum, machine, painted with emulsion paint

 

2. Floor
The stairwell and boiler room porcelain tiling or equivalents, in the cells tenant concrete screed

 

3. Railings
The stairwell with a height of 110cm, openwork profiles and painted steel pipes

 

4. Window frames
ALU windows, double glazed

 

5. Entrance to the building
Double exterior doors in an aluminum frame, glazed with safety glass with self-closing

6. Lift
Buildings A3 and A4 equipped with an elevator from the ground floor to the last floor.

STANDARD OF FINISH OF THE BUILDING FROM OUTSIDE

1. External plasters
Structural thin film on a layer of polystyrene with an invoice lamb; on selected items mosaic plaster or wood cladding and other materials

2. window sills
In the coated steel sheet with flange

3. Roof
Cover in graphite tiles, gutters and downspouts


4. Driving and pedestrian access to the building
Access roads and pedestrian streets lined with concrete on cement-sand posypce

 

5. Parking
Made of concrete blocks full or openwork; parking space purchased by the customer closed stooge kładzionym

 

 

 

 

Mieszkanie B4.3

 

 

 

 

 

Mieszkanie B5.14

 

 

 

 

 

Mieszkanie B7.3B

 

 

 

 

 

Mieszkanie B7.6

 

 

 

 

 

Mieszkanie B7.12