pl

PARK ESTATE - MOSINA

Flats in the Government Scheme for young first time buyers. Ready to move into.

 

The factor which attracts people to this investment is definitely the location.It is situated in the Town Centre nearby public facilities and a Shopping Centre.In the immediate vicinity of the green enclave - the National Park allows you to relax and also participate in active recreation.Residents can expect numerous hiking trails and bike paths running alongside the most beautiful lakes in the region.



The most important advantages of our investments include:

  • Convenient access to the City Centre – 23 mins by train and 25 mins by car
  • Building contains 47 apartments: studios, 1 and 2 bedrooms
  • 8 commercial premises on the ground floor
  • Spacious balconies
  • Parking spaces
  • Interesting architecture
  • Close to school, nursery, health clinic and numerous retail and service points.
  • In the vicinityof theWielkopolska National Park and Rogaliński Nature Park.

 

Airport

Poznan Lawica

24 km

30 min

WBK Bank Zachodni

Mosina Plac 20 Października 14

180 m

1 minuta

Railway Station

Mosina ul. Kolejowa 26

1 km

4 minuty

PKO BP

Mosina ul. Farbiarska 28

650 m

3 minuta

Bus stop

PKS Mosina ul. Marii Konopnickiej

150 m

1 min

PEKAO SA

Mosina Plac 20 Października 6

290 m

1 minuta

Old Market Square

Poznan Centre

21 km

28 minut

Gospodarczy Bank Spółdzielczy

Mosina ul. Dworcowa 9

1,1 km

4 minuty

Post Office

Mosina ul. Kolejowa 1

600 m

2 minuta

Wielkopolska National Park

Mosina

ul. Budzyńska

200 m

2 minuta

Vis Medica. Health clinic

Mosina ul. Dworcowa 3

1 km

4 minuty

High Scchool

Puszczykowo ul. Jana Kasprowicza 3

7 km

7 minut

Primary School

Mosina ul. Szkolna

700 m

3 minuta

SAVIA

Mosina ul. Marii Konopnickiej 33

350 m

4 minuty

NETTO

Mosina ul. Kolejowa 33

1 km

4 minut

STANDARD OF FINISH OF FLATS

1. Primer for floors
Cementitious screeds erased mechanically stacked Styrofoam insulation. The level of cementitious screeds in all areas at the same height. Primers prepared for panels or tiles.

2. Supporting walls
With hollow ceramic or silicate blocks.

3. The interior plaster walls and ceilings
Single-layer, plaster done mechanically, prepared for filling and painting

4. Ceilings
Reinforced concrete filigree

5. Windows
PVC innovative hardware, gaping, Tilt-turn (as documented construction), double glazed with a coefficient K = 1.1 W / m2K. From the street. Krotowskiego increased through the use of acoustic insulation glass 8/16/4 izofono. Under the windows of a depression (recess) for mounting the window sill with a thickness of 3cm. Standard does not cover the delivery and assembly of internal window sills

6. Entrance doors to apartments
Burglar, single, full apartment number and viewfinder

7. Partitions
With silicate blocks / concrete blocks plastered on both sides

8. Balconies
Isolated przeciwwilgociowo, balustrades in the form of steel components using cladding panels fastened to the structure railing, according to the draft

9. Electrical Installation
Approach 3-phase electric kitchen; 20-30cm above the floor sockets, switches approximately 1.4m above the floor, the installation of an electric bell. Switches and sockets in white color, lighting points ended dice. The distribution and quantity according to the project
10. Installation of water and sewage

Installation of hot and cold water run in floors, ducts or chases. Water meter for each premises. Sewage system with PVC pipes run in floors, ducts or chases. It does not include white assembly

11. The gas pipe
Does not occurlin dwellings

12. Install C.O.
Pipelines C.O. carried out in the roof floor of the lower layers connection of radiators. Steel radiators, and panel valves termoregulacyjnymi. Counter thermal energy consumption

13. Install TV, telephone and online
To bring the installation into each dwelling for TV, TEL, INTERNET. Location outlets according to the project

14. Intercom installation
One dwelling intercom connection with the entrance to the stairwell

STANDARD OF FINISH OF BUILDINGS AND PARTS OF COMMON (INSIDE)

1. Internal plasters
Gypsum, machine-painted with emulsion paint

2. Floor
The stairwell and technical areas of tiles stoneware or equivalent solutions. In cells tenant screed.

3. Railings
The stairwell with a height of 110cm, openwork profiles and painted steel pipes

4. Entrance to the building
Double exterior doors in aluminum frame, glazed with self-closing

5. A Ventspils cage elevator from the ground floor to the last floor of the building

STANDARD OF FINISH OF BUILDINGS FROM OUTSIDE

1. External plasters
Structural thin film on a layer of polystyrene with an invoice lamb

2. Window sills
In the coated steel sheet, with flange

3. Roof
Warming of polystyrene with torching membrane roofing

4. Driving and pedestrian access to the building
Access roads and pedestrian streets lined with concrete on cement-sand posypce

5. Parking
Made of concrete blocks full or openwork.

Call to get acquainted with housing:

 

Karolina Haussa 603 650 119              Jusrtyna Reimann-Skrzypek 603 650 522                Mateusz Glema 603 650 004

 

 

 

Mieszkanie A14


 

 

 

Mieszkanie C4


 

 

 

Mieszkanie C8


 

 

 

Mieszkanie D12