pl

SŁONECZNY STOK ESTATE - KIELCE

    

                       

 


 

II STAGE ON SALE

 

Housing Słoneczny Stok is an elegant and modern residential building with a feature service on the ground floor, realized in Kielce at Pilsudski.

Stage II investment Słoneczny Stok consists of one 6-storey building, which was located 63 apartments for sale ranging in size from 33 to 56 m2.

An undoubted advantage is the location of the object. Quiet Kielce district will allow everyone to find peace and harmony. The proximity of the center and good communication make it possible to quickly get to the job site or retail and service outlets. In the vicinity of the Słoneczny Stok are: kindergarten, school and universities.

In 2013, Słoneczny Stok project has been appreciated by the residents of province. Świętokrzyskie and she won the Silver Crane in the contest Golden Crane in 2012.

In the competition were selected the most beautiful and the best investment of the year in the.

STANDARD OF FINISH OF FLATS

1. Primer for floors
Cementitious screeds mechanically erased laid on thermal insulation

2. Supporting walls
25 cm thick silicate blocks

3. The interior plaster walls and ceilings
Gypsum plaster walls done mechanically

4. Ceilings
Mullion design and layout of the plate,
Monolithic reinforced concrete ceilings

5. Windows
PVC windows, low-emissivity glass U = 1.0 of diffusers higrosterowalnymi, innovative hardware, Tilt - turn and sills ext. marble conglomerate

6. Entrance doors to apartments
Full burglary wood-like veneer with visor

7. Partitions
Partition walls with a thickness of 8 cm and 12 cm silicate blocks plastered on both sides

8. Balconies
Concrete sleepers on a damp proof membrane with the membrane temozgrzewalnej. Railings, steel, powder-coated according to the draft. Floor tiles, non-slip, mrozoodp [arable with cokolikiem

9. Electrical Installation
Power to the individual units of the main board services, installations in place by individual arrangement to be performed by the customer on their own. Power distribution for the functioning of each room according to the project

10. Installation of water and sewage
Installation of hot and cold water PP (sealed) conducted in shafts and chases. Water meter for each premises. Sewage system with PVC pipes conducted in shafts and chases

11. The gas pipe
Does not occur in dwellings

12. Install C.O.
Pipelines C.O. conducted on the ceiling in layers of flooring. Steel panel radiators with valves termoregulacyjnymi. The counter-power in installation shafts

13. Install TV, telephone and online
RTV television installation carried out in layers of floor jacks specified in the draft. One entrance telephone installed in the hall

14. Intercom installation
One dwelling intercom connection with the entrance to the staircase located in the hall

STANDARD OF FINISH PREMISES SERVICE

1. Primer for floors
Cementitious screeds mechanically erased laid on thermal insulation

2. Supporting walls
25 cm thick silicate blocks

3. The interior plaster walls and ceilings
Gypsum plaster walls done mechanically

4. Ceilings
The design and layout of pole - plate, monolithic reinforced concrete ceilings.

1.Tynki inside.
Gypsum, machine-painted with emulsion.

2. Posadzki.
The stairwell and heat lining of porcelain tiles. In cells tenant concrete screed.

3.Balustrades
The stairwell with a height of 110cm, powder coated steel.

4. Entrance to the building.
Interior doors alumionowej double in the frame, glazed with safety glass with self-closing.

5. Windows
Sites of aluminum, advertising space

6. Partitions
Partition walls with a thickness of 8 cm and 12 cm silicate blocks plastered on both sides

7. Electrical Installation
Power to the individual units of the main board services, installations in place by. individual arrangement to be performed by the customer on their own. Power distribution for the functioning of each room according to the project

8. Installation of water and sewerage
Installation of hot and cold water PP (sealed) conducted in shafts and chases. Water meter for each premises. Installation of sewerage fed into the space provided for the toilets in the project, with PVC pipe conducted in shafts and chases

9. Gas installation
There is no service at the premises

10. Install C.O.
Installing underfloor coffee shops, the installation of air curtains for power supplied to the area of ​​main entrances, heat registers specific to each service and commercial premises

11. Install TV, telephone and online
RTV television installation carried out in layers of flooring with slots defined in projekcie.Jedno dwelling intercom connection with the entrance to the staircase located in the hall

12. Instalation ventilation, air conditioning
Ventilation brought to the rooms according to the project, in public toilets exhaust fan

STANDARD OF FINISH OF BUILDINGS AND COMMON SPACES (INSIDE)

 

1. Plasters
Gypsum, machine-painted with emulsion

2. Flooring

The stairwell and heat lining of porcelain tiles. In cells tenant concrete screed

3. Balustrades
The stairwell with a height of 110cm, powder coated steel

4.Entry building
Interior doors alumionowej double in the frame, glazed with safety glass with self-closing

STANDARD OF FINISH OF BUILDINGS FROM OUTSIDE

1. Plasters
Mineral exterior plaster on the facades rustication; plinths and façade cladding clinker brick basement

2.Parapety
Window sills coated sheet steel in the color of windows

3.Roof
The flat roof covered with torching membrane. Rain water discharge from the flat roof with the use of gravitational roof drain with PVC collar type PLUVIA, veiled warming

4. Entry and reaching the building
Access roads and pedestrian streets paved with concrete on sand-posypce cemontowo

Parking 5th position
2 fulfill the function of the parking underground garages with separate entrances and communication system. The budget forecast 64 parking spaces

 

 

 

Flat 4

 

 

 

Flat 6

 

 

 

Flat 7

 

 

 

Flat 9