pl

Wolsztyn

  

 

In the first stage of the project created 46 new homes for sale, located in 2 buildings consisting of 3 storeys. Available apartments are 2, 3 and 4 bedroom with a kitchenette or a separate kitchen. We offer a wide selection of apartments, metric area starting at 41 m2, ending up to 70 m2. The premises are deposited in a developer. Each apartment will have a parking place on the estate. The general contractor of the investment is the developer JAKON from Tarnow Podgórne.Developer status housing includes doors, heating system - radiators and pin wiring and water and sewage prepared for assembly fittings. The common parts will be finished. In the future, we plan to expand settlements. The target is to be built 14 multifamily buildings after 23 spacious and comfortable apartments in each.

 

 

STANDARD FINISH OF FLATS

1. Primers for floors
Cementitious screeds erased mechanically stacked on the insulation of expanded polystyrene. The level of cementitious screeds in all areas at the same height. Primers prepared for panels or tiles

2. Supporting walls
Thickness of 18cm and 25cm from the clay tiles

3. Internal plasters for walls and ceilings
Single-layer, plaster done mechanically category III., Prepared for filling and painting

4. Ceilings
Reinforced concrete filigree

5. Windows
PVC innovative hardware, gaping, Tilt-turn (according to the construction documentation) with a veneer exterior. Glazed set dwuszybowym coefficient of K = 1.1 W / m2K. The windows on the ground floor equipped with external blinds manually operated. Under the windows decrease (recess) for mounting the window sill with a thickness of 3cm. Standard does not include delivery and assembly of internal window sills

6. Entrance doors to apartments
Burglary, single, complete with the number of housing and visor

7. Partitions
With silicate blocks / ceramic / concrete blocks plastered on both sides

8. Balconies
Insulated against humidity, railings in the form of elements: steel - glass - plate composite according to the project

9. Electrical Installation
Approach 3-phase electricity to the kitchen; jack 20-30cm above the floor, switches approximately 1.4 m above the floor, the installation of an electric bell. Switches and sockets in white, lighting points ended dice. The distribution and quantity according to the project

10. Installation of water and sewage
Installation of hot and cold water conducted in floors, shafts or grooves. Water meter for each premises. Sewage system with PVC pipes run in floors, shafts or grooves. It does not include white assembly

11. The gas pipe
Is not present in the premises

12. Installation C.O.
Pipelines C.O. carried out in the roof of the lower layers of the floor connecting the radiators. Steel radiators, and panel valves termoregulacyjnymi. Heat consumption meter

13. Installation of TV, telephone and internet
To bring the installation into each dwelling for TV, TEL, INTERNET. Location outlets according to the project

14. Intercom installation
One connection intercom residential premises from the entrance to the stairwell

STANDARD FINISHES OF BUILDINGS AND COMMON (INSIDE)

1. Internal plasters
Gypsum, machine, painted with emulsion paint

2. Floor
In the stairwell and in the boiler room of tiles stoneware

3. Railings
The stairwell with a height of 110cm, openwork profiles and steel pipes, painted

4. Window frames
PVC windows, double glazed

5. The entrance to the building
External doors double aluminum frame, glazed safety glass, with self-closing

STANDARD FINISH BUILDING EXTERIOR

1. External plasters
Structural thin film on a layer of polystyrene 15cm, textured lamb; on selected items plaster mosaic

2. External window sills
In the coated steel sheet, with flange

3. Roof
Flat, covered with tar paper on the polystyrene layer 20cm, gutters and downspouts

4. Driving and pedestrian access to the building
Access roads and pedestrian streets paved / concrete ekokostką

5. Internal roads and parking spaces
Cubes made of concrete slabs or openwork; parking space purchased by the customer closed