pl

Księżycowa - Poznań Grunwald

APARTMENTS AND COMMERCIAL UNITSARE READY!

 

Księżycowa offers a contemporary architectural form, whilst keeping the characteristicof the local urban layout..Two independent 4-storey condominium buildings with a simple shape, clear and muted tones and spaciously designed apartments.

 

The buildings were divided into three utility zones:

Residential Part- the project includes 46 apartments differing in size. They vary from 35 to 78 m2.Apartments located on floors 2-4, have spacious balconies, loggias or large glass window surfaces.In order to make the design of the building more interesting, the last floor is divided into two parts, with duplexes gaining access to the roof terraces.The ground floor apartments also have separate gardens attached to the property.

 

Commercial Part –6 commercial units ranging in size from 35 to 103 m2 are located at the front of the building .

 

The underground section has been designed with two spacious car parks with separate storage facilities for residents.The space between the buildings has been organised with landscaping, green areas and a playground, available exclusively for residents.

 

The most important advantages of our investments include:

  • Locationin the prestigious district- PoznanGrunwald,
  • Close proximity to theparkand green areas
  • Near a nursery, school, church andshops
  • Quick access tothe City centre
  • Safe, enclosedbuildings
  • Liftin each gate
  • Undergroundcar park.
  • High specfinish,
  • Gardensadjacent to theground floor apartments, the top floorwith spacious terraces.

 

Please find the links below for the Municipal Development Planshowing our location surrounded with green areas excluded from building development.

5MW–our development plot

2ZP- public greenery areas, city parkadjacent to ourplot

3ZP- public greenery areas, town squareadjacent to ourplot

Airport

Poznan Lawica

6km

11 min

WBK Bank Zachodni

ul. Grunwaldzka 108

500 m

1 min

Railway Station

Poznan Central

5,5 km

23 min

PKO

ul. Grunwaldzka 165

650 m

23 min

Bus Station

PKS Poznan

5,5 km

23 min

PEKAO S.A.

ul. Grochowska 49

500 m

1 min

Old Market Square

Poznan Centre

6,5 km

25 min

AptekaPharmacy

ul.Cześnikowska 2

260 m

3 min

Pharmacy

ul.Grunwaldzka 99

200 m

3 min

CertusMedical Centre

ul. Grunwaldzka

600 m

8 min

Post Office

ul.Grunwaldzka 58

500 m

5 min

CHATA POLSKA

ul. Grochowska 49

270 m

3 min

Kindergarten No. 46

ul. Moon 10

20 m

0,5 minuty

NETTO

ul.Grunwaldzka 104a

350 m

4 minuty

 

High School No. 11

ul. Ściegiennego 134

650 m

10 minut

STANDARD OF FINISH OF FLATS

1. Primer for floors
Cementitious screeds erased mechanically stacked Styrofoam insulation. The level of cementitious screeds in all areas at the same height. Primers prepared for panels or tiles

2. Supporting walls
Thickness of 18 cm of silicate blocks, 24 cm thick reinforced concrete

3. The interior plaster walls and ceilings
Single-layer, plaster done mechanically, prepared for filling and painting

4. Ceilings
Reinforced concrete filigree

5. Windows
PVC innovative hardware, gaping, Tilt-turn, with diffusers (according to construction documentation) from the outside of the laminate on the inside in white, double glazed with a coefficient K = 1.1 W / m2K. Under the windows of a depression (recess) for mounting the window sill with a thickness of 3cm. Standard does not include the supply and installation of interior window sills

6. Entrance doors to apartments
Burglar Class C, single, complete with visor

7. Partitions
With silicate blocks / concrete blocks plastered on both sides

8. Balconies
Przeciwwilgociowo insulated, finished with tiles porcelain tiles, railings in the form of a steel-and-glass elements, according to the draft

9. Electrical Installation
Approach 3-phase electric kitchen; 20-30cm above the floor sockets, switches, about 1.4 m above the floor. Installation prepared for installation of an electric bell. Switches and sockets in white color, lighting points ended dice. The distribution and quantity according to the project

10. Installation of water and sewage
Installation of hot and cold water run in floors, ducts or chases. Water meter for each premises. Sewage system with PVC pipes run in floors, ducts or chases. It does not include white assembly

11. The gas pipe
There is a building

12. Install C.O.
Pipelines C.O. carried out in the roof floor of the lower layers connection of radiators. Steel radiators, and panel valves termoregulacyjnymi. The bathrooms bathroom radiators. Meter heat consumption at each place. The heat will be supplied to the building from the city.

13. Install TV, telephone and online
For each property supplied installation, TV and telephone and Internet in the form of fiber. Located television outlets, telephone and Internet according to the project

14. Video entry installation
One connection videophones for each dwelling from the entrance to the stairwell

15. Other
The one key

STANDARD OF FINISH OF BUILDINGS AND COMMON SPACES (INSIDE)

1. Internal plasters
Gypsum, machine-painted with emulsion paint

2. Floor
On the staircase finished with natural stone flooring and tiles porcelain tiles. In the garage and in the cells concrete floor tenant. The technical rooms floor tiles

3. Pull handles
On the staircase handrail stainless steel

4. Window frames
The windows and aluminum facades, double glazed, gray

5. Entrance to the building
Double exterior doors in an aluminum frame, glazed with safety glass with self-closing

6. Hall garage
Access to the garage from the outside through the gate with remote control inside through elevator and staircase hall area separated from the storerooms wire mesh walls

7. Lift
In each frame schodowaej elevator to the garage to the last floor

8. Lighting
On the stairwells and in the garage controlled by motion sensors

STANDARD OF FINISH OF BUILDINGS FROM OUTSIDE

1. Elevation of the building
Finished with structural plaster of thin-textured lamb on a layer of Styrofoam and brick and plate in a cavity wall. On selected items plaster mosaic

2. window sills
In the coated steel sheet

3. Roof
Non-ventilated flat roof

4. Driving and pedestrian access to the building
Access roads and pedestrian streets lined with concrete on cement-sand posypce

5. Parking
Made of concrete blocks full or openwork

6. Land development
The internal area is fenced, with access limited gate in belonging to the building will be located: landscaping elements in the form of benches, garbage cans, lamps, etc.

 

 

 

MIESZKANIE 29 

 

 

MIESZKANIE 32